Our cooling systems are engineered specifically for high-density crypto mining hardware.

1.2 MW Solution Tailor-Designed for Antminer 3U miners, Supporting up to 90 units
Our cooling systems are engineered specifically for high-density crypto mining hardware.
Lower temperatures, higher hashrate stability, and reduced energy waste.
From compact units to full containerized data centers, all solutions are modular and ready for expansion.
Technical Data
1200 kW
90 Antminer U3S21EXPH / U3S23H
PLC touchscreen integrated with leak detection, temperature control, system monitoring, alarming, constant pressure control
45ft HQ container, 13716 (L) mm × 2438 (W) mm × 2896 (H) mm
container with integrated dry cooler - 13,860 kg

We offer full-cycle engineering and project design services tailored to your mining infrastructure needs.

Systems designed to grow with your mining operation: from single-unit setups to multi-MW data centers.

Advanced cooling systems are designed for high heat recovery efficiency.


In 2026, a U.S. client selected a turnkey, high-availability containerized solution featuring a custom 1.2 MW hydro-cooling system for a high-density mining environment, with full redundancy and BiXBiT AMS integration.